The brief
The work covered site coordination, RCC structure and masonry interfaces against consultant drawings.
Stage referenceLevels and access were confirmed before mobilising.
Stage referenceReinforcement and formwork followed inspected pour cycles.
Stage referenceMasonry interfaces were checked as the frame progressed.
Stage referenceDefined civil checkpoints supported stage closure.
Stage referenceThe structural package was handed over for finishing trades.
Challenge / response
ChallengeArchitectural openings required close alignment with the structural package.
ResponseOpening schedules were checked before each relevant pour and masonry stage.
ResultThe completed shell retained the intended architectural relationships.
Timeline